Version 2 (modified by 9 months ago) ( diff ) | ,
---|
Design and Integration meeting: 27 February 2024 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Simulations.
- Engineering.
- AOB
Actions
Notes
Present: Andy Goulden, Clive Hill, Ta-Jen Kuo, Ajit Kurup, Ken Long, Hywel Owen, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte
Apologies: Jaroslaw Pasternak
- Simulations
- Slides from WS
- Comparison of tracking with different Gabor lens models.
- Slides from KL
- Different source models.
- Comparison of solenoids and Gabor lenses
- Looked at different beam pipe diameters.
- First go of the LhARA magnet
- TJK showed Opera model
- Slides from WS
- Engineering
- CH: working on update of the schematic of the transfer line.
- Milestone report - CH
- Text on the controls from Graham Cox.
- Building concept hasn't changed much so will refer to 12-month report.
- Update on shielding calculations.
- Vacuum concept section in progress should be ready soon.
- Power consumption has not changed so will refer to the 12-month report.
- RF
- Not much has changed. Will look to see what was written in the 12 month report and update that.
- CH has got a CAD model of the RF cavity from Rob Matheson. Can add that to the report.
- CH can progress the write up and present next week.
- AOB
- WS: early bird deadline for IPAC is tomorrow.
Attachments (2)
- 2024-02-27-Long.pptx (25.1 MB ) - added by 9 months ago.
- 20240227_WShields.pdf (3.1 MB ) - added by 9 months ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.