Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2024/2024-05-07


Ignore:
Timestamp:
May 14, 2024, 11:59:23 AM (6 months ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2024/2024-05-07

    v1 v2  
    99* Engineering.
    1010* AOB
     11
     12== Actions ==
     13
     14== Notes ==
     15Present:  Clive Hill,  Mark Johnson, Ta-Jen Kuo, Ajit Kurup,   Hywel Owen,  Matt Pereira,  Will Shields, Colin Whyte \\
     16Apologies:   Andy Goulden,  Ken Long, Jaroslaw Pasternak,   Rehanah Razak 
     17
     18        * Milestone report
     19                * Just need to transfer the milestone report to the 18th month.
     20                * HO: need to add the drawing of the cavity.
     21                        * CH to check the CAD file.
     22        * Simulation
     23                *  WS:
     24                        * Working on the IPAC paper
     25                        * Looking at beam size in the injection line.
     26                                * Discussion regarding size of the beam, dispersion and beam distribution.
     27                * TJK:
     28                        * Field clamp design.
     29                        * Looked at attaching the clamp to the yoke.
     30        * Engineering - CH
     31                * Showed the cavity CAD models. Ferrite won't fit as it is. MA should
     32                * Looking at injection line.
     33                        * Need details of the septum. Looked at the EMMA design.
     34                        * Space constraint for the septum and the large injection angle. There is space for a magnet 450mm wide.
     35        * AOB