Design and Integration meeting: 18 June 2024 15:00 GMT

Zoom: https://ukri.zoom.us/j/99571436156

Agenda

  • Engineering.
  • Simulations.
  • AOB

Actions

Notes

Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Ken Long, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte
Apologies: Andy Goulden, Mark Johnson, Hywel Owen, Jaroslaw Pasternak

  • Engineering - CH
    • Update on the injection line layout.
  • Simulations
    • TJK: Showed slides on yoke and clamp optimisation discussed at last week's meeting.
    • WS:
      • In contact with DL re GPT simulation. Should be now fixed.
      • Using beam from Ken's code and putting through stage 1.
      • Impact of having a permanent magnet quad just after nozzle.
  • AOB
    • Discussion on what should go in the final report.
      • CW: Straw-man outline would be good.
      • CH: What about the high-energy transfer line
        • Discussion.
        • CH: Can WS send details of the locations of the beam line elements.
      • Discussion on the RF cavity.