Version 2 (modified by 5 months ago) ( diff ) | ,
---|
Design and Integration meeting: 18 June 2024 15:00 GMT
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Engineering.
- Simulations.
- AOB
Actions
Notes
Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Ken Long, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte
Apologies: Andy Goulden, Mark Johnson, Hywel Owen, Jaroslaw Pasternak
- Engineering - CH
- Update on the injection line layout.
- Simulations
- TJK: Showed slides on yoke and clamp optimisation discussed at last week's meeting.
- WS:
- In contact with DL re GPT simulation. Should be now fixed.
- Using beam from Ken's code and putting through stage 1.
- Impact of having a permanent magnet quad just after nozzle.
- AOB
- Discussion on what should go in the final report.
- CW: Straw-man outline would be good.
- CH: What about the high-energy transfer line
- Discussion.
- CH: Can WS send details of the locations of the beam line elements.
- Discussion on the RF cavity.
- Discussion on what should go in the final report.
Attachments (2)
- 1272-pa1-meng-prs-0020 v1.0 FFA Ring.pptx (6.4 MB ) - added by 5 months ago.
- 06042024.pptx (8.1 MB ) - added by 5 months ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.