  • Research/LhARA/DesignAndIntegration/Meetings/2024/2024-07-30

    v1 v2  
    88* Simulations.
    99* AOB
     10
     11== Actions ==
     12
     13== Notes ==
     14Present:    Clive Hill, Ta-Jen Kuo, Ajit Kurup,  Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields  \\
     15Apologies:  Andy Goulden, Mark Johnson, Ken Long, Hywel Owen, Colin Whyte
     16
     17        * Engineering
     18                * CH went over the slides from the meeting 2 weeks ago. Discussed the questions on Clive's slides.
     19                * JP had meeting with RAL group last week.
     20                        * BPM should be no more than 10cm in length.
     21                        * Elements (including the RF cavity) can be tilted wrt to the radial direction without any significant effect.
     22                * TJK: New design of the magnet has an increased spiral angle and the field index has decreased. Will have an impact on the space available.
     23                * Discussion re how the design will change and how to present this in the CDR.
     24                * CH showed an FEA simulation of the vacuum chamber and areas of increased deflection.
     25                        * Centre of the chamber needs to be strengthened.
     26        * Simulations
     27                * WS: ongoing studies using the beam produced by Ken's code.
     28
     29