| 10 | |
| 11 | == Actions == |
| 12 | |
| 13 | == Notes == |
| 14 | Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields \\ |
| 15 | Apologies: Andy Goulden, Mark Johnson, Ken Long, Hywel Owen, Colin Whyte |
| 16 | |
| 17 | * Engineering |
| 18 | * CH went over the slides from the meeting 2 weeks ago. Discussed the questions on Clive's slides. |
| 19 | * JP had meeting with RAL group last week. |
| 20 | * BPM should be no more than 10cm in length. |
| 21 | * Elements (including the RF cavity) can be tilted wrt to the radial direction without any significant effect. |
| 22 | * TJK: New design of the magnet has an increased spiral angle and the field index has decreased. Will have an impact on the space available. |
| 23 | * Discussion re how the design will change and how to present this in the CDR. |
| 24 | * CH showed an FEA simulation of the vacuum chamber and areas of increased deflection. |
| 25 | * Centre of the chamber needs to be strengthened. |
| 26 | * Simulations |
| 27 | * WS: ongoing studies using the beam produced by Ken's code. |
| 28 | |
| 29 | |