wiki:Research/LhARA/DesignAndIntegration/Meetings/2024/2024-11-12

Design and Integration meeting: 12 November 2024 16:00 BST

Zoom: https://ukri.zoom.us/j/99571436156

Agenda

  • Engineering.
  • Simulations.
  • AOB

Notes

Notes:

Present: WS, CH, KL, MP, RR, JP, TJK Absent: HO, CW

  • Engineering
    • No updates.
  • Simulation
    • MP: Uniformity limited to sqrt(2 x pi) of the incoming beam size (see attached slides). Will impact transmission in beam delivery.
    • TJK: Scaled field down to get larger GFR. Clamp height varying, good ring tune observed. Will investigate tune for lower energies (~7 MeV).
    • RR: Prepping for IC meeting(s), aiming to present next week.
Last modified 6 weeks ago Last modified on Nov 13, 2024, 11:31:28 AM

Attachments (2)

Download all attachments as: .zip

Note: See TracWiki for help on using the wiki.