Version 2 (modified by 8 days ago) ( diff ) | ,
---|
Design and Integration meeting: 12 November 2024 16:00 BST
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Engineering.
- Simulations.
- AOB
Notes
Notes:
Present: WS, CH, KL, MP, RR, JP, TJK Absent: HO, CW
- Engineering
- No updates.
- Simulation
- MP: Uniformity limited to sqrt(2 x pi) of the incoming beam size (see attached slides). Will impact transmission in beam delivery.
- TJK: Scaled field down to get larger GFR. Clamp height varying, good ring tune observed. Will investigate tune for lower energies (~7 MeV).
- RR: Prepping for IC meeting(s), aiming to present next week.
Attachments (2)
- 241112_WP6_FF_Uniformity.pdf (522.8 KB ) - added by 9 days ago.
-
20241112.pptx
(2.7 MB
) - added by 8 days ago.
Ta-Jen_magnet_presentation
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.