     1LhARA Project WPM Meeting 20th February 2024 14:00 GMT =
     2
     3Meeting URL: ​https://strath.zoom.us/j/84550543598?from=addon
     4
     5Meeting ID: 845 5054 3598 Password: 737274
     6
     7-------------------------------------------
     8
     9= Agenda
     10
     11== Bridging funds
     12
     13=== K Long - discussion - slides ([raw-attachment:01-2024-02-20-Long.pptx here])
     14
     15Bridging funds - discussion
     16
     17Deliverables
     18Work Package 1. Project management: Deliverables
     19
     20• '' D1 Early progress review CDR M6 ''
     21• '' D2 Interim progress review CDR M12 ''
     22• '' D3 Pre-CDR Review M18 ''
     23• '' D4 CDR M24 ''
     24
     25• ''' D5 Initial progress review TDR & technical de-risk update M30 '''
     26• ''' D6 Interim progress review TDR & technical de-risk update M36 '''
     27• ''' D7 Final progress review TDR & technical de-risk update M42 '''
     28• ''' D8 Stage 1 TDR & technical de-risk report M48 '''
     29
     30
     31• D9 Pre-TDR2 review M54
     32• D10 TDR2 M60
     33Milestones
     34
     35Work package 2: Laser-driven proton and ion source
     36
     37• ''' M2.3: Investigation and demonstration of 10 Hz debris and damage challenges at ICL M36 '''
     38• ''' M2.4: Demonstration of continuous operation of 1 Hz beam generation on SCAPA M48 '''
     39
     40Work package 3: Proton and ion capture
     41
     42
     43• ''' M3.3: Progress report on increased voltage penning trap simulations and operation. M36 '''
     44• ''' M3.4: Final report high voltage penning trap operation. M48 '''
     45
     46• M3.6: Ion focussing results M60
     47
     48
     49=== Radiobiological Science and technology
     50
     51   Work Package 7:
     52
     53 • ''' M7.1: Develop beamline and bespoke facilities at SCAPA for radiobiology experimentation M30 '''
     54 • ''' M7.2: Preliminary results from cell survival/DNA damage experiments with laser-accelerated protons at SCAPA M36 '''
     55 • ''' M7.3: Development of RBEs of laser-accelerated protons (versus pre-existing cyclotron-driven protons) in established cell lines M48 '''
     56 • ''' M7.4: Assessment of DNA damage repair kinetics and immunopeptidomic analysis of laser-accelerated protons M48 '''
     57
     58   Work package 4: Ion-acoustic dose mapping
     59
     60 • ''' M4.3: Iterative reconstruction methods M42 '''
     61 • ''' M4.4: Integration: ultra-sonic array with radiobiology station M48 ''' may require manpower up-lift and some equipment funds
     62 • ''' M4.5: LhARA ion-acoustic test results M48 '''
     63
     64 Work package 5: Novel end-station development
     65
     66 • ''' M5.4: Construct transportable beam delivery end-station M42. '''
     67 • ''' M5.6: Report on LhARA stage 1 beam monitoring system M48. '''
     68
     69
     70Work package 6: Design and integration
     71
     72• ''' M6.2: Final review of R&D work towards LhARA Phase 1 TDR M42 '''
     73• ''' M6.3: Review of R&D work towards LhARA Phase 2 TDR M48 '''
     74
     75Work Package 8:
     76
     77• ''' Creation of collaborative international clinical research group M40 '''
     78• ''' Wider public engagement - All party parliamentary group on radiotherapy M48 '''
     79
     80== PA1
     81
     82=== Achievements
     83
     84- humble bragg competition?
     85
     86=== WP5 consultation 3, Jan 24th Liverpool.  Excellent meeting
     87
     88https://indico.stfc.ac.uk/event/923/?print=1
     89
     90
     91== AOB