wiki:Research/LhARA/ProjectBoard/Meetings/2024/02-20

Version 1 (modified by cwhyte1, 3 months ago) (diff)

--

LhARA Project WPM Meeting 20th February 2024 14:00 GMT =

Meeting URL: ​https://strath.zoom.us/j/84550543598?from=addon

Meeting ID: 845 5054 3598 Password: 737274


Agenda

Bridging funds

K Long - discussion - slides (here)

Bridging funds - discussion

Deliverables Work Package 1. Project management: Deliverables

  • D1 Early progress review CDR M6
  • D2 Interim progress review CDR M12
  • D3 Pre-CDR Review M18
  • D4 CDR M24
  • D5 Initial progress review TDR & technical de-risk update M30
  • D6 Interim progress review TDR & technical de-risk update M36
  • D7 Final progress review TDR & technical de-risk update M42
  • D8 Stage 1 TDR & technical de-risk report M48
  • D9 Pre-TDR2 review M54
  • D10 TDR2 M60

Milestones

Work package 2: Laser-driven proton and ion source

  • M2.3: Investigation and demonstration of 10 Hz debris and damage challenges at ICL M36
  • M2.4: Demonstration of continuous operation of 1 Hz beam generation on SCAPA M48

Work package 3: Proton and ion capture

  • M3.3: Progress report on increased voltage penning trap simulations and operation. M36
  • M3.4: Final report high voltage penning trap operation. M48
  • M3.6: Ion focussing results M60

Radiobiological Science and technology

Work Package 7:

  • M7.1: Develop beamline and bespoke facilities at SCAPA for radiobiology experimentation M30
  • M7.2: Preliminary results from cell survival/DNA damage experiments with laser-accelerated protons at SCAPA M36
  • M7.3: Development of RBEs of laser-accelerated protons (versus pre-existing cyclotron-driven protons) in established cell lines M48
  • M7.4: Assessment of DNA damage repair kinetics and immunopeptidomic analysis of laser-accelerated protons M48

Work package 4: Ion-acoustic dose mapping

  • M4.3: Iterative reconstruction methods M42
  • M4.4: Integration: ultra-sonic array with radiobiology station M48 may require manpower up-lift and some equipment funds
  • M4.5: LhARA ion-acoustic test results M48

Work package 5: Novel end-station development

  • M5.4: Construct transportable beam delivery end-station M42.
  • M5.6: Report on LhARA stage 1 beam monitoring system M48.

Work package 6: Design and integration

  • M6.2: Final review of R&D work towards LhARA Phase 1 TDR M42
  • M6.3: Review of R&D work towards LhARA Phase 2 TDR M48

Work Package 8:

  • Creation of collaborative international clinical research group M40
  • Wider public engagement - All party parliamentary group on radiotherapy M48

PA1

Achievements

  • humble bragg competition?

WP5 consultation 3, Jan 24th Liverpool. Excellent meeting

https://indico.stfc.ac.uk/event/923/?print=1

AOB