wiki:Research/LhARA/RadiationBiology/Meetings/2026-08-20

LhARA Radiobiology Meeting: 20Aug26; 14:00 BST

ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1

Meeting Notes

  1. Beamline Simulation
    • Josie: Characterisation of ELI and SCAPA sources Slides
      • Using the LLO simulation and changing the electron temperature in the model to match the energy spectra for the ELI and SCAPA beamlines
      • SCAPA fitted with 5.5MeV electron temperature
      • ELI fitted with 0.25MeV electron temperature
      • Will chat with Ewan to discuss further
      • Need information on the source divergence
    • Josie: Simulations of a dipole at SCAPA
      • Have funding for dipoles
      • First introduction of dipoles indicates a 90% beam loss
      • Need a more accurate measurement of the space to work in
      • Can test at Birmingham
      • Josie to talk to Darsebury to get more information on sensible dipole parameters
      • Next beamtime will probably not include this dipole arrangement
  1. BioPrep
    • Alex's plan: Slides
      • Use transwell with 10um membrane
      • Use absorbent paper on the side of transwell with media
        • Don't need cells to be in media
        • Concern that as the cells/paper dries the thcikness of media will change and the cell will receive a different dose?
      • No cell lid and no media means we can place RCF behind the cells
        • With the cells being vertical little concern over contamination
        • Could cover all but one of the holes on the carousel with a Perspex cover
          • This will keep the moisture in the dish
          • Uncover just to irradiate and then rotate back under
          • This also works for a vertical beam so sterilisation is not an issue
            • Maybe add a second plastic screen above the beamline just in case
          • Can always use antibacterial media
      • Have 6, 12, and 24 well plates so we can cluster the cells that all see the same dose ie reduces the spatial variation.
      • Also could flash-freeze the media and do analysis on that (bystander)
      • Whether electrical impedance to check the cell layer is a monolayer and other techniques
    • Need to dry run and understand cell survival
      • Colin to take Alex on a tour of SCAPA (Aiming for next week)
    • Need an understanding of the publishable minimum
      • Roshine and Marie to draft a plan and to share with Emma and Jason (and Josie)
      • Incubator downstairs in SCAPA?
        • Consider the CO2
      • Minimum repeats is 3
      • Minimum cell lines is 2
      • Which cell lines
        • Emma and Jason prefer their HeLa and FaDu since already done Birmingham runs with them
        • Think about using the hardier cell lines from Glasgow as well
  1. Instrumentation
    • Fast Electrons
      • Giuseppe and Richard H. looking at this and need to find the apparatus with the right parameters for our system
      • Ken to visit on October
    • RCF
    • Air Scintillation
      • Colin/Narendar: Planning to meet to discuss the feasibility of the implementation at SCAPA and the timeframe
  1. SCAPA
    • Updates: None (On experiment)
  1. Review Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
  1. DoNM
    • 03/09/26
  1. AoB

Summary of actions required

In-Beam Diagnostics

  • Unassigned: Acquire a glass sheet
  • Unassigned: Get a new RCF batch and calibrate
  • TP: Testing delaminating EBT3
  • PH: Obtain transparent fibre or an alternative method for light transport
  • PH: Obtain a lens for hollow fibre tests
  • CD: Simulate energy deposited in transport fibres
  • KL, CD, JMcG, PH: Design a system to make full scifi prototypes
  • KL, CD, JMcG, PH: Make a full scifi prototype
  • KL, CD: Send clear fibre to SCAPA before 16th August (Contact Ewan or Colin since Robbie is USA)
  • KL, CD, JMcG, PH: Discuss visit to Birmingham to test SciFi
  • RW, CD: Study the correlation between laser diagnostics and mean dose
  • Unassigned: Investigate how a phosphor sheet could be incorporated into the design of the cell dish
  • CW: Investigate the feasibility of ICTs for our beamline
  • MH: Investigate LET detector
  • CW: Ask Narender about air fluorescence implementation
  • JMcG: Investigate using IF as a dosimeter
  • GS, RH: Investigate fast electron diagnostic
  • TP: Investigating commerical delaminated EBT4

Bio Next Steps

  • EM, CD, JMcG: Write up technical summary of Phase 2
  • EM: Write up a biology plan for a 2 PMQ setup
  • Unassigned: Obtain an inverted microscope
  • Unassigned: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's)
  • Unassigned: Obtain a thermostat for the incubator
  • EM: Run controls to examine how long the cells can survive vertically
  • JMcG: Plan a test of vertical cell survival using Emma/Jason's HeLa cell line and Marie's cell line
  • JMcG: Produce a HeLa colony that can survive on Mylar
  • CW, AM: Show Alex around SCAPA

Beamline Modelling

  • Unassigned: Investigate how to improve the beamline beyond CV=8%
  • CD: Examine energy spectra variation
  • JMcG, ED: Discuss spectra fits and SCAPA source divergence
  • JMcG: Talk to Darsebury to get more information on sensible dipole parameters

Alternate Beamlines

  • JMcG: Simulate BELLA
  • JMcG: Simulate ELI

Last modified 2 weeks ago Last modified on Aug 20, 2026, 4:41:27 PM