LhARA pre-CDR Meeting 17th March 2020
Meeting details
14:00 Room 532, Blackett Lab.
Zoom details:
Join Zoom Meeting https://ukri.zoom.us/j/865262978
Phone one-tap: United Kingdom: +442034815237,,865262978# or +442039663809,,865262978#
Join by Telephone For higher quality, dial a number based on your current location.
United Kingdom:
+44 203 481 5237
+44 203 966 3809
+44 131 460 1196
+44 203 051 2874 0800 031 5717Meeting ID: 865 262 978
Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978
International numbers https://ukri.zoom.us/u/ap9aBI2Eh
SIP: 865262978@…
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP: 865262978@… https://ukri.zoom.us/skype/865262978
Agenda
- Action items from last meeting.
- None
- System updates.
- Laser driven proton and ion source.
- Proton and ion capture.
- Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
- Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
- Biological end stations.
- Infrastructure and Integration.
- Floor plan updates from Simeon, see TD-3000-0229 07.bmp, TD-3000-0229 09.bmp and TD-3000-0229 18.bmp
- Project plan for the delivery of LhARA.
- Safety.
- End-to-end simulation.
- Instrumentation.
- R&D plan and schedule.
- Pre-publication review of the pre-CDR.
- Practice talks.
- A.O.B.
Notes
Participants: AK, TD, HTL, KL, WS, JPas, OE, GA
- System updates
- Laser - OE
- Version in Overleaf is now ready for final editing.
- Capture.
- AK discussed with CW minor changes to the R&D plan. Overleaf has been updated to reflect this.
- Ready for final editing.
- Beam transport
- WS: Stage 1 complete.
- JPas: Working on writing up Stage 2.
- Completed injection line in Overleaf.
- MADX file for updated Stage 1 to allow injection, see attachments.
- AK: will add this to the repository.
- HTL: Extraction and end stations part has been updated in Overleaf. All finalised.
- End stations. AK spoke with JPar:
- Updating what is in Overleaf for the end stations, introduction and motivation sections.
- Costs have been updated.
- Infrastructure and integration - GA
- Updated costing.
- Will send a new version soon after updating it with the R&D costs.
- Meeting scheduled for Thursday to review the costing before finalising it in Overleaf.
- Will create risk register and add risks based on past experience.
- Layout updated by Simeon. See attachments. Need a good looking rendered image for the front cover.
- Updated costing.
- Instrumentation
- Ready for final proof reading.
- Laser - OE
- pre-CDR review - KL.
- AK: CW suggested having a run through of the presentations prior to the review.
- Agreed to do this on the 27th March from 13:30.
- This will be via Zoom as well as the review itself, since College will be closed.
- AK to send email re review and practice talks.
- Agenda for the review is fixed.
- Arrangements for Yolanda's meeting.
- Key people are Jason and Yolanda.
- Other people welcome.
- Will aim to have document completed by the end of the week to circulate to LhARA consortium and CCAP.
- AOB
- JPas: Have an updated version of CCAP-v4.3 to allow injection.
Attachments (4)
- TD-3000-0229 07.bmp (5.2 MB ) - added by 5 years ago.
- TD-3000-0229 09.bmp (5.2 MB ) - added by 5 years ago.
- TD-3000-0229 18.bmp (5.2 MB ) - added by 5 years ago.
-
CCAP-v4.3i.madx
(2.4 KB
) - added by 5 years ago.
Version of lattice 4.3 tuned for injection into Stage 2
Download all attachments as: .zip