wiki:Research/DesignStudy/Meetings/2020/2020-06-16

Version 4 (modified by longkr, 4 years ago) ( diff )

--

LhARA Weekly Meeting 16th June 2020; 14:00 BST

Agenda

  1. Notes of previous meetings and actions:
    • KL: Create draft response to referees.
    • KL: Add new participants to the relevant mailing lists.
      • Done.
    • KL: Report detailed timeline and requirements for the EPSRC Transformative Healthcare Technologies call as they are known.
      • Done. And, discussion now an agenda item.
    • KL/WS: to exchange emails with AK re "restart" of experiment and simulation meetings.
      • Ongoing.
  1. Status of pre-CDR publication: KL
    • Journal has sent the paper to the referee(s).
  1. Preparation of response to referees: KL, ALL
  1. Updates:
    • Capture section: CW
    • Simulation:
      • Particle production at laser target]: HTL
      • Gabor lens simulation: TSD
    • Any other simulation

  1. CCAP plenary, 24Jun20 KL, All
    • KL needs to add new participants to the relevant mailing lists.
    • Proposed talks:
      • Overview (Kurup)
      • Design of the accelerator facility (Pasternak)
      • Simulating the accelerator facility (Shields)
      • Simulating the end stations (Hughes)
      • Possibly something on target and capture (HTL, TSD, CW, to be decided).

  1. Next steps: All
    • To include discussion of development of proposal for 3-year R&D programme
    • Unanimously agreed to prepare an application to the EPSRC Transformative Healthcare Technologies call.
    • KL will report detailed timeline as soon as it is known.

  1. AOB
    • JPar: 19Jun radiobiology event; all encouraged to attend.

Agenda

  1. Introduction: KL
  1. Notes of previous meetings and actions:
    • KL: Create draft response to referees.
  1. Status of publication and pre-CDR:
  1. Preparation of response to referees: KL, ALL
  1. Updates:
    • Capture section: CW
      • Update on electrostatic simulation of Gabor lens: TSD
    • Simulation:
      • Particle production at laser target: HTL
    • Any other simulation
  1. Plans for CCAP plenary, 24Jun20; KL, JPa
  1. Next steps: All
    • To include discussion of development of proposal for 3-year R&D programme
  1. AOB

Attachments (3)

Download all attachments as: .zip

Note: See TracWiki for help on using the wiki.