Version 7 (modified by 4 years ago) ( diff ) | ,
---|
Gabor Lens meeting: 10Sep20; 16:00 BST
Present: CW, BB, HT, TD
Summary of actions
- KL Get CW a wiki account.
- HT To prepare slides for Martin King – ready for review next week
- TD To find paper cited in ERC proposal on tape drive - post on Wiki with relevant referenced papers.
Notes
- 3D sim – supports claim than proton energy is x2 smaller in 3D than in 2D
- sim – not necessarily convergent
- cut at 15um removes high energy particles – as a result online graphs are not representative
- Hollow plasma column - 4 fold structure caused by holes in anode?
- Sim with no holes still 4 fold- cartesian
- Will look at the electromagnetic solver (CW to interface w. David Speirs)
- electrons lost, mostly on central electrode
- Beam propagation into plasma – results look as expected.
Agenda
- Introduction, notes and actions: KL/All
- KL Get CW a wiki account.
- Progress on beam experiments paper: TN
- AOB: All
Attachments (2)
- LhARA_Capture_10Sep20_TSD.pdf (467.2 KB ) - added by 4 years ago.
- meeting_HTL_100920.pdf (248.4 KB ) - added by 4 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.