wiki:Research/GaborLens/Meetings/2020/09/10

Version 8 (modified by td1719, 4 years ago) (diff)

--

Gabor Lens meeting: 10Sep20; 16:00 BST

Present: CW, BB, HT, TD

Summary of actions

  • KL Get CW a wiki account.
  • HT To prepare slides for Martin King – ready for review next week
  • TD To find paper cited in ERC proposal on tape drive - post on Wiki with relevant referenced papers.

Notes

  1. Updates on the particle generation: HT
  • 3D sim – supports claim than proton energy is x2 smaller in 3D than in 2D
  • sim – not necessarily convergent
  • cut at 15um removes high energy particles – as a result online graphs are not representative
  1. Updates on simulation of "IC" lens: TSD
  • Hollow plasma column - 4 fold structure caused by holes in anode?
  • Sim with no holes still 4 fold- cartesian
  • Will look at the electromagnetic solver (CW to interface w. David Speirs)
  • electrons lost, mostly on central electrode
  • Beam propagation into plasma – results look as expected.

Agenda

  1. Introduction, notes and actions: CW/All
    • KL Get CW a wiki account.
  1. Progress on beam experiments paper: TN

  1. Updates on the particle generation: HT
  1. Updates on simulation of "IC" lens: TSD
  1. AOB: All

Attachments (2)

Download all attachments as: .zip