Version 4 (modified by 5 years ago) ( diff ) | ,
---|
SmartPhantom meetings: Wednesday 30th October 2019
There are two meetings today. The first (at 09:30 CET) will not be a teleconference. The discussion will just be between those at MedAustron. The second (at 12:00 CET) will be video-conference using the VIDYO system.
09:30 CET meeting Agenda:
- Welcome and announcements: MP
- SmartPhantom development: status and plans: HTL
- Discussion
To include:- Space, support for SmartPhantom and associated cameras, USB system and computer;
- Support for SmartPhantom within the water phantom;
- Length of light quides and other cabling;
- Mains power and other requirements.
- Trigger signal and electrical communications:
- Position of signal, connector, cable, voltage pulse shape;
- Communication from control room to research room:
- E.g. ethernet cable location, length, etc.
- Logistics:
- What arrangements do we need to make to set up for and to execute the experiemnt?
- Personal dosimetery for those involved.
- Registration procedures etc.
- RP procedures; what is required before we take SmartPhantom away.
- Space, support for SmartPhantom and associated cameras, USB system and computer;
- Summary, actions and next steps: All
12:00 CET meeting:
Meeting details
Videoconference using the Vidyo system.
Connection details:
Please join the VIDYO meeting by clicking this link: https://vidyoportal.cern.ch/join/SPJlsfAOEV
If you want to join by phone, please use one of the phone numbers listed in the link below:
http://information-technology.web.cern.ch/services/fe/howto/users-join-vidyo-meeting-phone
The PIN for the phone connection is: 1079548*150260
Agenda:
- Outcomes from the morning discussions: HTL/LC/KL
- Discussion
If appropriate: routine agenda:
- Notes and actions from last meeting:
- KL: Liaise to develop concept for polishing.
- HTL: Add CCAP note number to the header of the note and post it as a CCAP note.
- LC: Complete detailed design of the boot.
- KL: Needs to confirm detail with M.Puchalska.
- KL: Look into Vidyo, ZOOM, or Skype for next week's meeting.
- Mechanical design/manufacture update: LC
- Single-fibre test setup: HTL
- Schedule revision discussion: All
- Spend: outstanding requirement: All
- Visit to MedAustron: All
- Next steps: All
- DONM
- AoB
Attachments (2)
- SmartPhantom_Status.pdf (18.8 MB ) - added by 5 years ago.
- SmartPhantom_Costing_301019.pdf (118.9 KB ) - added by 5 years ago.
Download all attachments as: .zip