Version 17 (modified by 3 years ago) ( diff ) | ,
---|
LhARA Work Package Managers pages
The LhARA Work Package Managers (WPM) group was formed to prepare the first significant proposal prepared by the LhARA collaboration over the summer of 2021. The WPM group plays a role analogous to that of the Technical Board in a typical large collaboration.
Representation: the membership of the Work Package Managers Group may be found here.
Communication: send an email to the Steering Group using the following mailing list on the Imperial mail server (Imperial.ac.uk): ccap-lhara-wpm@…
Meetings
Future:
- 16 September 2021: Plenary meeting
Past:
- 02 September 2021 : WP3 meeting with the Project Office
- 02 September 2021: WP2 meeting with Project Office
- 19 August 2021: Meeting for initial discussion of the work packages
- 5 August 2021; 10:30 BST
Proposal; status and development
27Aug21: Skeleton: PDF; and WORD
Timeline for preparation
- 13Sep21: Definition of scope overall and by work package
- 04Oct21: Initial drafts of text for scientific proposal and management annex
- 01Nov21: "Ink drying"; i.e. proposal complete
Documentation, background information, and useful links
STFC Project Management framework
Attachments (11)
- 2021-08-27-LhARA-proposal-d0.1.pdf (271.6 KB ) - added by 3 years ago.
- 2021-08-05-LhARA-proposal-template.docx (25.7 KB ) - added by 3 years ago.
- 2021-09-09-LhARA-proposal-d0.2.docx (28.3 KB ) - added by 3 years ago.
- 2021-09-09-LhARA-proposal-d0.2.pdf (274.1 KB ) - added by 3 years ago.
- 21_10_15_RiskReg.xlsx (16.0 KB ) - added by 3 years ago.
- 2021-10-15-LhARA-WP1.xlsx (23.1 KB ) - added by 3 years ago.
- 21_11_02_RiskReg.xlsx (33.0 KB ) - added by 3 years ago.
- 21_11_03_RiskReg.xlsx (33.5 KB ) - added by 3 years ago.
-
LhARA1-DK.mpp
(528.0 KB
) - added by 3 years ago.
LhARA proposal M project
- LhARA1-DK_21_12_01.mpp (1.1 MB ) - added by 3 years ago.
- LhARA-Gov-PMB-2023-05.pdf (224.8 KB ) - added by 15 months ago.
Download all attachments as: .zip