LhARA radiobiology; meeting: 05Feb26; 14:00 BST
ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
Attended: KL, RW, CW, RA, PH, MB, AFr, MH, EM, CD
Meeting Notes
- Minutes and actions completed:
- AFr, DA: Write out RCF procedure document
- DONE
- CD: Use sim to answer how many protons per shot in each fibre
- DONE
- AFr, DA: Write out RCF procedure document
- In-Person Meeting
- Date: DECIDED 24th Feb at Birmingham
- Discussion on location
- Confirmed Birmingham. Jason and Emma to book a room for max 20 people.
- Invite LMU to join online
- Invite Liverpool to share their work on air scintillation
- Invite Chris Armstrong to join for instrumentation section
- Draft Agenda: https://indico.stfc.ac.uk/event/1834/
- Make clear to include timetables for SCAPA and ELIMED (and LMU)
- Make clear a section on improved survival rates of cells
- SCAPA RW,ED:
- General Update
- Laser fixed
- Running a DSTL till mid-march, going to be around April before access again
- Josie asked for Dipoles from IoM charity. Waiting outcome
- Bio EM,JP,MB:
- Actions Checklist
- MB/EM: Send and evaluate the cells
- Delivered
- EM, JMcG: Write up summary of PoPLaR Phase 2, including technical summary of cell irradiation procedure
- EM: Share the counting software she uses with Marie
- Done
- Oxford Optronix, Gelcount
- MB: Comet analysis
- MB/EM: Send and evaluate the cells
- General Updates
- Cells have been delivered to Birmingham
- Looks like nothing on HeLa. FaDu looks more promising
- Caution required due to dose variation
- Before next run inform Marie the dates so she can book out the incubator to be used
- Ideas to improve cell survival rates
- Swap out HeLa with Glioma cell line (EBW). More robust.
- Would need to send some to Birmingham
- Emma to email Rosh about when to take them out the freezer
- Dry runs indicate that if the cells are only out for 20/25mins then good survival
- Remove the RCF after irradiation reduces time drastically
- Cells could be too cold
- Heating the whole holder could provide enough heat to keep the cells warm for longer
- Cells could be hypoxic
- Pre-gas the cells?
- Keep the holder rotating so that the cells stay wet during irradiation
- Swap out HeLa with Glioma cell line (EBW). More robust.
- Cells have been delivered to Birmingham
- Beamline Diagnostic, KL, TP, CD, PH:
- Actions Checklist
- EM/ED/LJ: Send calibration films to SCAPA and scan them in both orientations
- Delivered
- AFr, DA: Write out RCF procedure document
- DONE
- CD, TP: Evaluate LET in the cells with the RCF in front
- CD: Use sim to answer how many protons per shot in each fibre
- DONE
- EM/ED/LJ: Send calibration films to SCAPA and scan them in both orientations
- Protons per Fibre - CD
- Slides
- Estimating that the beam delivers 0.2mJ per shot per fibre, which works to 200W
- Oversaturation problem?
- Overview of RCF document
- General Updates
- CD, RW and AFr to discuss the best way to scan RCF
- DoNM
- 19th Feb 14:00
- AoB
- Prepare a summary for LhARA fortnightly on the day of the meeting
Summary of actions required
Phase 2 Analysis
- EM: Evaluate the cell results
- CD, AFr: Complete analysis of RCF with errors
- EM/ED/LJ: Send calibration films to SCAPA and scan them in both orientations
- CD, RW and AFr: Explain scanning procedure
- EM, JMcG: Write up summary of PoPLaR Phase 2, including technical summary of cell irradiation procedure
- MB: Comet analysis
- CD: Invite Liverpool, Chris Armstrong and LMU to join the in-person meeting
Beam Diagnostics
- Unassigned: Find all the errors associated with RCF
- RW, CD: Study correlation between laser diagnostics and mean dose
- CD, TP: Evaluate LET in the cells with the RCF in front
Improve Bio results
- EM: Inform Roshine when to defrost Glioma cell line
- Unassigned: Obtain an inverted microscope
Long-term
- CD, JMcG: Investigate how to achieve uniformity without a scatterer in place
- KL, CW: Cost 4 or 6 quad, and chicane systems
Last modified
2 months ago
Last modified on Feb 5, 2026, 3:31:15 PM
Attachments (2)
- ProtonsPerFibre.pptx (5.1 MB ) - added by 2 months ago.
- RCF Scanning Protocols for LhARA (2026).pdf (148.7 KB ) - added by 2 months ago.