Version 15 (modified by 5 years ago) ( diff ) | ,
---|
CCAP Plenary Meeting 5
11th December 2019; 14:00—18:00
Room 711c, Huxley Building, 180 Queen's Gate, Kensington, London SW7 2AZ
Meeting details
Videoconference using the Vidyo system.
Connection details:
Please join the VIDYO meeting by clicking this link: https://vidyoportal.cern.ch/join/SPJlsfAOEV
If you want to join by phone, please use one of the phone numbers listed in the link below:
http://information-technology.web.cern.ch/services/fe/howto/users-join-vidyo-meeting-phone
The PIN for the phone connection is: 1079548
Agenda
The agenda is being developed. If you wish to make a presentation, please contact Ken Long (K.Long@…) or Ajit Kurup (a.kurup@…).
Time | Title | Speaker |
14:00 | Welcome and introduction | K. Long (ICL) |
14:15 | Preparations for the LhARA pre-CDR | A. Kurup (ICL) |
14:45 | Status report for the Laser driven proton and ion source work package | O. Ettlinger (ICL) |
15:00 | Status report for the Proton and ion capture work package | J. Pozimski (ICL) and C. Whyte (Strathclyde) |
15:15 | Status report for the Stage 1 and Stage 2 beam transport work packages | J. Pasternak (ICL) and W. Shields (RHUL) |
15:30 | Coffee break | |
15:50 | Status report for the Infrastructure and integration work package | J. Thomason (RAL) and G. Aymar (RAL) |
16:05 | Status report for the end-to-end simulation work package | A. Kurup (ICL) |
16:20 | Review of activities at Charing Cross Hospital | R. Mclauchlan (CXH) |
16:35 | Analysis of CT images | A. Moawad and L. Jaugey (ICL/EPFL) |
16:50 | Progress with solid state detectors | A. Howard (ICL) |
17:05 | Status of the SmartPhantom development | HT Lau (ICL) |
17:20 | Closing Discussions | All |
Attachments (11)
-
20191210_CCAP_PHYSICS.pdf
(1.4 MB
) - added by 5 years ago.
McLauchlan Presentation
- 01-2019-12-11-Long.pptx (30.0 MB ) - added by 5 years ago.
- 2019-12-11-Kurup-preCDR.pptx (1.1 MB ) - added by 5 years ago.
- 2019-12-11-Kurup-Simulations.pptx (196.0 KB ) - added by 5 years ago.
- Aymar_LhARA_STFC_Update_20191211.pptx (464.7 KB ) - added by 5 years ago.
- HTL_Plenary_111219.pdf (19.3 MB ) - added by 5 years ago.
-
PowerPointAlixLouis.pptx
(551.2 KB
) - added by 5 years ago.
PowerPointAlixLouis
-
20191211_wshields.pdf
(13.1 MB
) - added by 5 years ago.
WShields slides
- AH_CCAP_Dec2019.pdf (308.8 KB ) - added by 5 years ago.
- Status_of_LhARA_11122019.pdf (1.8 MB ) - added by 5 years ago.
-
CCAP Plenary Meeting Dec 2019 Parsons.pptx
(19.6 MB
) - added by 5 years ago.
CCAP Plenary Meeting 111219 Parsons
Download all attachments as: .zip