Version 6 (modified by 5 years ago) ( diff ) | ,
---|
Pre-publication review of the LhARA pre-CDR
Administration
- Terms of reference
- For the reviewers: Expense claim form
- For the remote connection we will use Zoom. Connection details are below.
Agenda
Time | Speaker | Title |
---|---|---|
12:00—12:30 | Reviewers and PIs | Clarifications, administrative issues, and organisation |
12:30—12:45 | All | Assemble and contingency |
12:45—13:00 | K. Long (ICL) | Welcome and introduction |
13:00—13:25 | J. Parsons(Liverpool) | Radiobiological motivation and feedback from Y. Prezado |
13:35—13:55 | A. Kurup, pre-CDR PM (ICL) | LhARA pre-CDR overview |
13:55—14:00 | All | Contingency |
14:00—14:20 | Z. Najmudin (ICL) | Laser driven proton and ion source |
14:20—14:40 | C. Whyte (Strathclyde) | Proton and ion capture |
14:40—15:00 | J. Pasternak (ICL) | Design of the LhARA accelerator facility |
15:00—15:20 | W. Shields (RHUL) | Simulation of LhARA |
15:20—15:40 | J. Matheson (STFC RAL, PPD) | Instrumentation |
15:40—16:00 | J. Hughes (Liverpool) | Biological end stations |
16:00—16:20 | G. Aymar (STFC RAL, ISIS) | Infrastructure considerations |
16:20—16:30 | All | Contingency |
16:30—17:00 | Reviewers | Discussion |
17:00—17:30 | All | Feedback and close-out |
Zoom details
https://ukri.zoom.us/j/865262978
Phone one-tap:
United Kingdom: +442034815237,,865262978# +442039663809,,865262978#
Join by Telephone For higher quality, dial a number based on your current location.
Meeting ID: 865 262 978
United Kingdom:
+44 203 481 5237 +44 203 966 3809 +44 131 460 1196 +44 203 051 2874 0800 031 5717
International numbers https://ukri.zoom.us/u/ap9aBI2Eh
Join from an H.323/SIP room system H.323:
162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan)
SIP:
865262978@zoomcrc.com
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP:
865262978@lync.zoom.us https://ukri.zoom.us/skype/865262978
Attachments (32)
- 2020-03-09-LhARAR-preCDR-Review-ToR-final.pdf (56.6 KB ) - added by 5 years ago.
- ExpenseClaim2020.xls (115.5 KB ) - added by 5 years ago.
- 2020-03-24-LhARA_pre_CDR-d1.0.pdf (19.6 MB ) - added by 5 years ago.
- 01-2020-03-25-LONG-Intro.pptx (4.9 MB ) - added by 5 years ago.
- 01-2020-03-25-LONG-Intro.pdf (4.6 MB ) - added by 5 years ago.
- pre-CDR-Radiobiology-Motivation-March-2020.pdf (2.6 MB ) - added by 5 years ago.
- pre-CDR-Radiobiology-Motivation-March-2020.pptx (2.8 MB ) - added by 5 years ago.
- 2020-03-25-Kurup.pptx (1.6 MB ) - added by 5 years ago.
- 2020-03-25-Kurup.pdf (1.3 MB ) - added by 5 years ago.
- 2020-03-27-review.CDR.YP.pdf (181.9 KB ) - added by 5 years ago.
- 2020-03-31-LhARA_pre_CDR-d2.0.pdf (10.6 MB ) - added by 5 years ago.
- 01-2020-03-31-LONG-Intro.pdf (3.5 MB ) - added by 5 years ago.
- 01-2020-03-31-LONG-Intro.pptx (5.0 MB ) - added by 5 years ago.
- 03-2020-03-31-Kurup.pptx (719.0 KB ) - added by 5 years ago.
- 03-2020-03-31-Kurup.pdf (1.2 MB ) - added by 5 years ago.
- 09-JH-BES-preCDR-Meeting-310320-1.pdf (1.2 MB ) - added by 5 years ago.
- 09-JH-BES-preCDR-Meeting-310320-1.pptx (2.1 MB ) - added by 5 years ago.
- 05-LhARA_PPR_Whyte_20_03_30.pdf (747.9 KB ) - added by 5 years ago.
- 10-Aymar_LhARA_STFC_Update_20200331.pptx (7.2 MB ) - added by 5 years ago.
- 10-Aymar_LhARA_STFC_Update_20200331.pdf (6.2 MB ) - added by 5 years ago.
- 04-CCAP_PreCDR_Talk_LASER.pdf (8.5 MB ) - added by 5 years ago.
- 07-WShields_LhARA_Simulations.pdf (3.4 MB ) - added by 5 years ago.
- 02-pre-CDR-Radiobiology-Motivation-March-2020.pdf (1.2 MB ) - added by 5 years ago.
- 02-pre-CDR-Radiobiology-Motivation-March-2020.pptx (2.1 MB ) - added by 5 years ago.
- 08-Lhara_Inst_v10.pdf (6.2 MB ) - added by 5 years ago.
- 08-Lhara_Inst_v10.pptx (12.0 MB ) - added by 5 years ago.
- 06-LhARA_Design_Review_31032020.pdf (2.1 MB ) - added by 5 years ago.
- 05-LhARA_PPR_Whyte_20_03_31.pdf (741.2 KB ) - added by 5 years ago.
- Lhara-Pre-CDR-Review-input-from-Bolton-03-04-20.pdf (72.2 KB ) - added by 5 years ago.
- LhARA-review-v7-March-2020-Draft.pdf (161.6 KB ) - added by 5 years ago.
- 2020-04-10-LhARA-review-summary.pdf (173.0 KB ) - added by 5 years ago.
- 2020-04-10-LhARA-review-summary-final.pdf (193.7 KB ) - added by 5 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.