Version 9 (modified by 5 years ago) ( diff ) | ,
---|
Pre-publication review of the LhARA pre-CDR
The availability of the reviewers has dictated that the review will take place in two parts. On the 25th March 2020 a review of the radiobiological aspects of the LhARA programme will take place. The review of the source, accelerator, instrumentation, and project aspects will take place on the 31st March 2029.
The terms of reference for the review can be found below.
Venue
The review will be conducted as a sequence of video conferences as a result of the travel restrictions imposed to combat the spread of Covid-19. purely by video conferencing using Zoom. Connection details can be found below.
Agenda 25th March 2020
Time* | Speaker | Title |
---|---|---|
13:00—13:15 | K. Long (ICL) | Introduction |
13:15—13:50 | J. Parsons (Liverpool) | The motivation for LhARA |
13:50—14:10 | A. Kurup (ICL) | Overview of the LhARA facility |
14:10—15:30 | All | Discussion |
15:30—16:00 | Y. Prezado (Curie Institute) | Conclusions and close-out |
* Times are to be understood to include 5 minutes for questions.
Agenda 31st March 2020
Time | Speaker | Title |
---|---|---|
12:00—12:30 | Reviewers and PIs | Clarifications, administrative issues, and organisation |
12:30—12:45 | All | Assemble and contingency |
12:45—13:00 | K. Long (ICL) | Welcome and introduction |
13:00—13:25 | J. Parsons(Liverpool) | Radiobiological motivation and feedback from Y. Prezado |
13:35—13:55 | A. Kurup, pre-CDR PM (ICL) | LhARA pre-CDR overview |
13:55—14:00 | All | Contingency |
14:00—14:20 | Z. Najmudin (ICL) | Laser driven proton and ion source |
14:20—14:40 | C. Whyte (Strathclyde) | Proton and ion capture |
14:40—15:00 | J. Pasternak (ICL) | Design of the LhARA accelerator facility |
15:00—15:20 | W. Shields (RHUL) | Simulation of LhARA |
15:20—15:40 | J. Matheson (STFC RAL, PPD) | Instrumentation |
15:40—16:00 | J. Hughes (Liverpool) | Biological end stations |
16:00—16:20 | G. Aymar (STFC RAL, ISIS) | Infrastructure considerations |
16:20—16:30 | All | Contingency |
16:30—17:00 | Reviewers | Discussion |
17:00—17:30 | All | Feedback and close-out |
Administration
- Terms of reference
- For the reviewers: Expense claim form
Zoom details
https://ukri.zoom.us/j/865262978
Phone one-tap:
United Kingdom: +442034815237,,865262978# +442039663809,,865262978#
Join by Telephone For higher quality, dial a number based on your current location.
Meeting ID: 865 262 978
United Kingdom:
+44 203 481 5237 +44 203 966 3809 +44 131 460 1196 +44 203 051 2874 0800 031 5717
International numbers https://ukri.zoom.us/u/ap9aBI2Eh
Join from an H.323/SIP room system H.323:
162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan)
SIP:
865262978@zoomcrc.com
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP:
865262978@lync.zoom.us https://ukri.zoom.us/skype/865262978
Attachments (32)
- 2020-03-09-LhARAR-preCDR-Review-ToR-final.pdf (56.6 KB ) - added by 5 years ago.
- ExpenseClaim2020.xls (115.5 KB ) - added by 5 years ago.
- 2020-03-24-LhARA_pre_CDR-d1.0.pdf (19.6 MB ) - added by 5 years ago.
- 01-2020-03-25-LONG-Intro.pptx (4.9 MB ) - added by 5 years ago.
- 01-2020-03-25-LONG-Intro.pdf (4.6 MB ) - added by 5 years ago.
- pre-CDR-Radiobiology-Motivation-March-2020.pdf (2.6 MB ) - added by 5 years ago.
- pre-CDR-Radiobiology-Motivation-March-2020.pptx (2.8 MB ) - added by 5 years ago.
- 2020-03-25-Kurup.pptx (1.6 MB ) - added by 5 years ago.
- 2020-03-25-Kurup.pdf (1.3 MB ) - added by 5 years ago.
- 2020-03-27-review.CDR.YP.pdf (181.9 KB ) - added by 5 years ago.
- 2020-03-31-LhARA_pre_CDR-d2.0.pdf (10.6 MB ) - added by 5 years ago.
- 01-2020-03-31-LONG-Intro.pdf (3.5 MB ) - added by 5 years ago.
- 01-2020-03-31-LONG-Intro.pptx (5.0 MB ) - added by 5 years ago.
- 03-2020-03-31-Kurup.pptx (719.0 KB ) - added by 5 years ago.
- 03-2020-03-31-Kurup.pdf (1.2 MB ) - added by 5 years ago.
- 09-JH-BES-preCDR-Meeting-310320-1.pdf (1.2 MB ) - added by 5 years ago.
- 09-JH-BES-preCDR-Meeting-310320-1.pptx (2.1 MB ) - added by 5 years ago.
- 05-LhARA_PPR_Whyte_20_03_30.pdf (747.9 KB ) - added by 5 years ago.
- 10-Aymar_LhARA_STFC_Update_20200331.pptx (7.2 MB ) - added by 5 years ago.
- 10-Aymar_LhARA_STFC_Update_20200331.pdf (6.2 MB ) - added by 5 years ago.
- 04-CCAP_PreCDR_Talk_LASER.pdf (8.5 MB ) - added by 5 years ago.
- 07-WShields_LhARA_Simulations.pdf (3.4 MB ) - added by 5 years ago.
- 02-pre-CDR-Radiobiology-Motivation-March-2020.pdf (1.2 MB ) - added by 5 years ago.
- 02-pre-CDR-Radiobiology-Motivation-March-2020.pptx (2.1 MB ) - added by 5 years ago.
- 08-Lhara_Inst_v10.pdf (6.2 MB ) - added by 5 years ago.
- 08-Lhara_Inst_v10.pptx (12.0 MB ) - added by 5 years ago.
- 06-LhARA_Design_Review_31032020.pdf (2.1 MB ) - added by 5 years ago.
- 05-LhARA_PPR_Whyte_20_03_31.pdf (741.2 KB ) - added by 5 years ago.
- Lhara-Pre-CDR-Review-input-from-Bolton-03-04-20.pdf (72.2 KB ) - added by 5 years ago.
- LhARA-review-v7-March-2020-Draft.pdf (161.6 KB ) - added by 5 years ago.
- 2020-04-10-LhARA-review-summary.pdf (173.0 KB ) - added by 5 years ago.
- 2020-04-10-LhARA-review-summary-final.pdf (193.7 KB ) - added by 5 years ago.
Download all attachments as: .zip